| Our
Clients Say It Best
|
Given the complexity and
the various
obstacles we
ran into during construction
on this data center,
MetroPower’s
performance
was fantastic.
Frank Mignella,
Construction Project Manager
BRUNS-PAK |
| |
|
|
| COMMERCIAL
PROJECTS |
|
 |

2008
- Neiman Marcus
Atlanta,
GA
Renovation of 3 story anchor store at Lenox Square Mall. Project is being
completed in phases so the store can remain open during the renovation.
|

2007
- Callaway Gardens / Lodge and Spa
Pine Mountain, GA
Complete electrical installation of a 140 room lodge and spa at Callaway Gardens.
|
2008
- Shoppes at River Crossing
Macon, GA
Electrical installation to a new retail shopping
complex with 270,000 sq ft of tenant space. Install
site lighting and secondary u/g service. This
service will have a switchboard, 480v house panel,
transformer and a 208v house panel. Fire Alarm
system and lighting controls installation. |
2007
- Bass Pro Shop
Retail Space
Macon, GA
Installed all electrical in 123,000 sq ft retail space building.
|
2008
- Olympia Mill Upfit
Columbia, SC
Complete electrical renovation for a 3
story mill that is being renovated into loft apartments
including lighting, ceiling fans, and fixtures. |
2009
- Publix Data Center
Alpharetta,
GA
Project included approximately 40,000 SF with 12,000
SF of raised floor. The electrical system was
totally redundant with (2) 5,000 main services, (2)
2,000kW generators, (4) 750kW UPS systems, (12) four
panel PDU’s and a 2,000kW loadbank. |
2009
- Woodlands at Furman University
Greenville,
SC
Provide a complete electrical system, fire
alarm, nurse call system for a six building assisted
/ independent living facility. Job includes
all lighting, generator system and all life safety
systems. |
Blue
Bell Creamery
Ice Cream Distribution
Center
Lexington, SC
Installed electrical distribution, building lighting, site lighting,
fire alarm, 4 truck docks, HVAC units, fuel island, 6 truck stations and sub-zero
freezer in a 13,300 sq ft ice cream distribution center.
|
Mauldin
Sports Center
New Construction
Mauldin, SC
Installed electrical for a new 2 story sports center.
The center consists of a fitness work out area with
an
attached gymnasium and locker room facilities for
men and women. Electrical system is new and consists
of lighting, gear and fire alarm.
|
Sticky
Fingers
New Restaurant
Charlotte, NC
Provided the installation of the complete electrical system for a new restaurant.
Connected owner provided kitchen equipment.
|
Covan
Moving Company
Warehouse Design Build
Columbus, GA
Furnished and installed 25 high bay fixtures for
75,000 sq ft warehouse. Installed fire alarm system,
conduit and wire for HVAC, convenience outlets and
Tele/Data outlets in office areas. Also furnished
and installed 6 400w wall packs on the exterior of the
building and 400 amp 120/208v service. Installed
conduit and wire for exhaust fans for warehouse,
kitchen and bathrooms. Installed 2x4 laying fixtures
in the office area.
|
|
|
|
| |
|