2008
Appling County Pellet Plant
Baxley, GA
Electrical construction and installation
of 3000A pull-out switchgear units, 3 – 800A
MCC’s, plant cable tray, conduit, copper,
fixtures, devices and some control devices. Site
lighting installed in all 8 areas.
|
2008
- Mohawk Neumag Installation
Bennettsville, SC
Complete installation of 5 Neumag systems. This
included 15 blenders, vacuum pumps, 15 extruders,
melt pumps, 5 manifolds, quench cabinets, drop tubes,
texturizers, and associated support equipment. Dow
Therm piping, recirculating water piping, and duct
work for the lines was also installed.
|
2007
- Georgia Pacific / Lime Mud Dryer
Cedar Springs,
GA
Project consisted
of installing 2,000 feet of various size stainless
steel cable trays with supports, over 150,000 feet
of tray cable, one new control panel, ten new drives
and 110 instruments. Also wired 26 new motors and
rewired existing Honeywell instruments.
|
ConAgra
Roaster
Sylvester, GA
Installed electrical to roaster and all associated equipment.
|
Timken
Plant
Buss & Substation
Cairo, GA
Installed electrical portion of
a new 12,470 volt substation and 800 amp
480 volt buss duct installation.
|
Ga
Pacific
Store Room
Cedar Springs, GA
Project consisted of roughly 1,500 lf of conduit and 4,000 lf of cable. We also
installed three 480v panels, 3 transformers, and 60 high bay lights.
|